The conventional construction method is to divide the warehouse; the thickness of the virtual paving design is about 130, and the thickness is designed to the thickness of the design; flattening; For example, the slope of the roof drainage is 4, the length of the drainage slope is 10.0 meters, and the thickest part of the insulation layer is 440 mm. The construction requires a large amount of cement. The 7th Bureau of China Construction Seventh Bureau is in the construction of a project, with reference to the principle of layered cement mortar grading practice, the design unit and the construction unit compete with each other, and the bottom layer of the slope is 120 mud perlite; the curved layer is 18 cement perlite. In the construction, the following measures are taken to compact the rock; the surface layer is left with a sufficient thickness of 80 mm, which is twice the thinnest part; the surface layer is strictly constructed according to the design mix ratio, and the surface layer strength is controlled at 1 Nm. 2.

The roof insulation layer of the project adopts a layered method, which saves 20 tons of cement and reduces the permanent load on the floor by 0.286 kN2. At the same time, the insulation effect is enhanced due to the decrease of the density of the insulation layer.

Shiyi Jinyan, who applied the lighting short circuit, â–¡ Li Gan Zhou Wenhui, the site temporary lighting is often enough to control more than ten lamps, and most of them use screw sockets. The reed of the lamp cap easily touches the screw one turn, causing a short circuit, blowing the fuse, and the short circuit point is not easy to find. and so.

The more the scene is waiting for the lights, the more difficult it is to repair the factory. At this time, the following method can be used, and the short-circuit point can be found relatively quickly, and the fault is eliminated.

The specific method is to put 8 pairs of people at the two ends of the insurance 0 to pick up the bubble 0, preferably at more than 200 watts, so that the current does not mean, the first one, the bulb, then the clamp current is placed in the most + range. First, measure 0, if the pointer is deflected, it proves that there is a short-circuit current, and the short-circuit point can be found. On the other hand, there is no short circuit in the 0 side. If the pointer does not move, it proves that there is no short-circuit current, there is no short-circuit in the aspect, and the fault point is in the aspect, so that the current can be measured, and the line or the lamp after 12 inspection can be followed by the half of the line towel at the short-circuit. Retest, and so on. At the location of the measurement, the pointer is measured again, the pointer does not move, Ding can be determined that the light 1 between the and the short circuit, then the power failure, the light will be removed, replaced with the fuse, the light is turned on, and returned to normal. .

Featured by its wide flat surface with top bend, T16 generates lighting with astonishing uniformity, covers all the colors we offer and all functions. All types of IP68 mold injection connectors and DIY connectors are also available for this size. This size can be widely designed for façade lighting, pool lighting, architecture lighting design and etc.

LED Constant current IC Neon

Neon Street Lights,Neon Light String,Flexible Neon Led Rope Lights,Small Neon Lights

Tes Lighting Co,.Ltd. , https://www.neonflexlight.com